Preventive Maintenance Metrics

FMX PM Performance · Rolling 24-month window · Building 110428
Occurrences: 6470 total · 3950 included · 2520 safety-excluded
Last pulled: 2026-06-22 19:45 UTC
← PM tasks · Unplanned metrics →
On-Time Performance

Fair-Rite policy: PM is due within 7 business days after it triggers (weekends and company holidays don't count). The headline rate counts anything completed within that grace as on-time, matching Phil's quarterly KPI methodology.

On-Time Rate
99.1%
3802 of 3836 completed within 7-day grace
Strict (No Grace)
80.5%
3088 of 3836 completed on/before trigger
Open & Overdue
2
past 7-day grace, not yet completed
Total Occurrences
3950
in rolling 24-month window
Volume by Month (24-month trailing)

PM Occurrences Created per Month

Quarter-over-Quarter On-Time Rate

Strict (blue) vs Lenient (green, ≤7d grace)

Completion State Mix (Rolling Window)

Where Every Occurrence Landed

Top 10 Users by Volume
User IDTotalOn TimeOverdueRate
618448 1519 1137 382 74.9%
619869 833 818 15 98.2%
617520 587 500 87 85.2%
676967 303 233 70 76.9%
674956 156 107 49 68.6%
643527 121 92 29 76.0%
683520 94 44 50 46.8%
680191 64 28 36 43.8%
617796 58 56 2 96.6%
650667 32 15 17 46.9%
Worst On-Time Tasks (≥4 occurrences)
TaskTotalOn TimeOverdueRate
Summer A/C inspection 5 0 4 0.0%
Annual Spring A/C inspection Main warehouse 4 1 2 25.0%
Annual Spring A/C inspection Powder Department 4 1 2 25.0%
Annual Spray Dryer Baghouse Inspection 4 1 2 25.0%
Annual Vehicle Registration 4 1 2 25.0%
Inspect Gutters 10 4 5 40.0%
Annual Inspection 4 2 1 50.0%
Air Handler Inspection Office Building #8 FR 36 18 17 50.0%
Annual Spring A/C inspection Office Building #8 4 2 1 50.0%
Inspection and lubrication Mule 6 3 2 50.0%